| | Phase | What Happens and Why It Matters |
| 1 | Consultation and Design | Joshua evaluates the existing tub space, bathroom dimensions, plumbing rough-in location, and drain position. Tile selection is made via the mobile showroom in your actual bathroom. Conversion type (standard or barrier-free), drain type, niche placement, bench inclusion, and glass enclosure style are all confirmed before anything is ordered. |
| 2 | Demolition | Tub, tub surround tile or fiberglass, and any drywall or greenboard behind the tub are removed. Greenboard (paper-faced moisture-resistant drywall) is not an appropriate shower substrate regardless of what the original builder used. All substrate behind the new shower must be replaced with proper backerboard or uncoupling membrane. |
| 3 | Plumbing Rough-In | [SCOPE: CONFIRM] Drain is repositioned if necessary for the new shower configuration. Showerhead and valve rough-in is adjusted to the new shower height and position. All plumbing work is performed by or coordinated with a licensed plumber. This phase must be completed and inspected before any waterproofing or tile work begins. |
| 4 | Shower Pan or Mud Bed | The shower floor is formed with a pre-sloped shower pan (foam or mortar bed) that directs water continuously toward the drain. Pre-slope is mandatory: a flat shower floor that does not drain completely creates the standing water conditions that drive moisture behind grout and into the wall cavity over time. |
| 5 | Waterproofing | Waterproofing membrane is applied continuously across the full shower floor, up the walls to above the intended tile height, and into all corners, niches, and bench surfaces. The drain collar is integrated into the membrane so the waterproofing plane has no gap at the most vulnerable point in the installation. This is the most critical step in the entire conversion. |
| 6 | Backerboard and Wall Prep | Cement backerboard or equivalent substrate is installed on all shower walls. All joints are taped and waterproofed. No paper-faced board of any kind in the wet zone. |
| 7 | Tile Installation | Wall tile is installed from the reference line up, with layout planned so cut tiles land symmetrically at the top and bottom. Floor tile is installed with grout joints sized for the specific tile format and application. Niche tile, bench tile, and any accent or feature tile are installed as part of the same sequence. |
| 8 | Grouting and Sealing | Grout is applied, packed fully into every joint, and finished consistently throughout the installation. Grout type (sanded, unsanded, epoxy) is selected for the specific joint size and application. Grout is sealed after cure where the product and application require it. |
| 9 | Glass and Fixtures | [SCOPE: CONFIRM] Frameless glass enclosure or shower door is installed after tile work is complete and cured. Showerhead, valve trim, and any additional fixture trim are installed. Final inspection of the full installation. |