Why the Shower Door Decision Belongs in the Tile Conversation, Not After It.
Most shower door problems, a door that swings into a space it should not because the opening position was not planned, hardware that anchors into hollow tile with no backing behind it, a glass panel that does not plumb correctly because the tile installation was not evaluated before glass was ordered, trace back to a sequence problem: the door was specified after the tile was installed rather than as part of the same project conversation.
When Joshua installs a custom tile shower and coordinates the glass enclosure, the door opening position is planned before the first tile is set. The wall blocking for hinge anchors is installed before the backerboard goes on. The threshold or curb height is built to accommodate the specific door system being installed. The tile layout is planned around the door opening width so the cut tiles at the door jamb are symmetrical. These are all decisions that cost nothing to get right at the beginning and are expensive to correct after the tile is in.
For homeowners replacing a door in an existing shower without tile work, Joshua evaluates the existing anchor points, the substrate behind the current hardware locations, and the condition of the existing tile at the hinge and handle positions before specifying the replacement system.



